Existing-Well Gas-Lift Retrofit

An existing completion cannot place a mandrel wherever an ideal design asks. This workflow maps the ideal unloading design onto the hardware that is actually installed.

What you provide

  • the existing completion and deviation survey;
  • installed mandrel MD/TVD and equipment information;
  • available injection conditions; and
  • the same well model used for the ideal design.

What MINT shows

  • the nearest feasible installed mandrel for each ideal valve;
  • ideal depth, selected installed depth, and depth error;
  • spacing and installation constraints;
  • operating-valve candidates;
  • placements that cannot be achieved with the installed hardware; and
  • the effect of the mapped design on unloading and steady operation.

The fixed completion is never silently treated as though it matched the ideal design. Infeasible placements remain visible and must be resolved by changing the operating plan, accepting a quantified compromise, or changing hardware.