Skip to content

Gas-Lift Well Design

Design the valve string, prove the well can unload, and identify the final operating valve.

Design workflow

MINT combines the active fluid, inflow, VLP, temperature, completion, and surface-pressure definitions to calculate:

  • unloading-valve count and placement;
  • measured and true vertical depth of each mandrel;
  • the final operating-valve candidate;
  • casing and tubing pressures at every valve depth;
  • spacing and installation feasibility;
  • valve opening and closing basis;
  • port capacity and required port size;
  • dome and test-rack opening pressures; and
  • the unloading sequence from startup to steady operation.

Depth-based schematic

The design is shown on the complete well rather than as an isolated table. The schematic locates the wellhead, casing, tubing, annulus, packer, perforations, mandrels, unloading valves, and operating valve against MD and TVD.

Selecting a valve links the schematic to its engineering row and displays its role, pressures, status, port, capacity, and feasibility.

Port sizing

Two questions are supported:

  1. What port is required to pass the target gas rate at the available pressure?
  2. What will a selected standard port pass under the calculated conditions?

The result includes predicted flow, pressure ratio, critical or subcritical flow, capacity margin, and applicability warnings. A candidate port is not a valid design until the complete unloading sequence has been rerun successfully.

Unloading simulation

Step through each unloading state to see the active valve, open and closed valves, injection route, produced-fluid route, tubing/casing pressures, liquid levels where calculated, and the event that transfers injection to the next valve. Display motion may be interpolated; engineering values come only from calculated states.