Artificial Lift¶
MINT uses the same fluid, inflow, VLP, nodal, well, scenario, unit, validation, and reporting framework for natural-flow and lifted wells. Artificial Lift is split into the engineering jobs below.
Gas-Lift Optimisation¶
Sweep lift-gas injection, solve the operating point at each rate, distinguish maximum production from maximum profit, quantify uplift and marginal efficiency, and apply the recommendation to the well.
Gas-Lift Well Design¶
Calculate valve count and depth placement, select the operating valve, check spacing and installation limits, size ports, calculate dome and test pressures, and inspect the unloading sequence on a depth-based well schematic.
Existing-Well Gas-Lift Retrofit¶
Map an ideal design onto installed mandrel depths, quantify depth error, expose infeasible placements, and evaluate the compromise imposed by fixed hardware.
Gas-Lift Operations & Diagnostics¶
Use surveys, pressures, temperatures, valve depths, and trends to assess likely injection depth, multipointing, leaks, unloading issues, and historical opportunity.
ESP Design & Optimisation¶
Enter the applicable vendor pump curve, size the stage count and duty, evaluate off-design frequency behavior, motor/cable/drive requirements, intake-gauge back-calculation, and the downhole installation envelope.
Shared rule¶
Lift results do not live in an isolated calculator. Applying a recommendation re-solves the active well so System, Gradient, Sensitivity, Flow Assurance, AI Agent, saved scenarios, and the report all use the same lifted state.